{"id":13,"date":"2019-06-13T09:06:59","date_gmt":"2019-06-13T09:06:59","guid":{"rendered":"http:\/\/www.aeenergy.com.au\/?page_id=13"},"modified":"2019-06-13T09:06:59","modified_gmt":"2019-06-13T09:06:59","slug":"services","status":"publish","type":"page","link":"https:\/\/aeenergy.xyz\/?page_id=13","title":{"rendered":"\u00c6nergy Services"},"content":{"rendered":"\n<p><strong>Process Engineering Consulting to the Oil and Gas Industry <\/strong><\/p>\n\n\n<ul class=\"wp-block-list\"><li>Oil, Gas, Water, Heavy Oil, HPHT Gas<\/li><li><emsp>Fixed topsides, Semi-submersible, FPSO, FSU, Dry Trees, Wet Trees<\/emsp><\/li><li><emsp><emsp>Compression, Subsea, Subsea Compression, Subsea Boosting, Separation, Dehydration<\/emsp><\/emsp>, Pumping, Control<\/li><li>Engineering Design and Process Simulation<\/li><\/ul>\n\n\n<p><strong>Project Engineering Consulting<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\"><li>Phase 1 and 2  &#8211; Business Case Development, Concept Select and Pre-FEED<\/li><li>Phase 3 &#8211; FEED<\/li><li>Phase 4 &#8211; Execution: Detailed Design, Commissioning and Start-up<\/li><li>Phase 5 &#8211; Operations<\/li><\/ul>\n\n\n<p><strong>Operations Experience<\/strong><br \/>Offshore operations experience for major and minor operators. <br \/>Commissioning and Start-up, debottlenecking, troubleshooting and normal operations.<br \/>At <strong>\u00c6nergy <\/strong>we ensure that the learnings from operational phases are included in the design phases. Our consultants have represented operations in design phases.<\/p>\n\n\n<p><strong>Develop a full subsea compression concept definition<\/strong><br \/>Based on either centrifugal or multiphase compression technologies with technology developments that could add value. An assessment of the options to  provide more cost-effective construction and\/or installation or enable simplified and cost-reduced solutions.  Understanding the status of further enhancements to the core  technologies and the associated risks to determine the value proposition  helps to understand the benefit in future-proofing your concept. <\/p>\n\n\n<p><strong>System Approach to Design<\/strong><br \/>Represent the opportunity from the system level &#8211; including other requirements: for example brownfield integration, controls implications, power requirements, environmental, safety, system and component testing, commissioning and operational implications.<\/p>\n\n\n<p><strong>Provide independent analysis and review<\/strong> <br \/>To validate concept screening or provide technical authority for all phases.<br \/><strong>Provide feasibility studies <\/strong><br \/>For  development of future fields, to demonstrate lease requirements to  realise full resource allocation or accelerate production through  existing or future infrastructure. <br \/><strong>Other field concept development <\/strong><br \/>Including liquid boosting and tie-backs.  <\/p>\n\n\n<p><strong>\u00c6nergy <\/strong>partner with other consultants and clients in the application of our working principles to topsides development for the improvement of platform safety, efficiency and equipment reliability. <\/p>\n","protected":false},"excerpt":{"rendered":"<p>Process Engineering Consulting to the Oil and Gas Industry Oil, Gas, Water, Heavy Oil, HPHT Gas Fixed topsides, Semi-submersible, FPSO, FSU, Dry Trees, Wet Trees Compression, Subsea, Subsea Compression, Subsea Boosting, Separation, Dehydration, Pumping, Control Engineering Design and Process Simulation Project Engineering Consulting Phase 1 and 2 &#8211; Business Case Development, Concept Select and Pre-FEED &hellip; <\/p>\n<p class=\"link-more\"><a href=\"https:\/\/aeenergy.xyz\/?page_id=13\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;\u00c6nergy Services&#8221;<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"class_list":["post-13","page","type-page","status-publish","hentry"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/aeenergy.xyz\/index.php?rest_route=\/wp\/v2\/pages\/13","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/aeenergy.xyz\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/aeenergy.xyz\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/aeenergy.xyz\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/aeenergy.xyz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=13"}],"version-history":[{"count":0,"href":"https:\/\/aeenergy.xyz\/index.php?rest_route=\/wp\/v2\/pages\/13\/revisions"}],"wp:attachment":[{"href":"https:\/\/aeenergy.xyz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=13"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}